Loading cart contents...
View Cart Checkout
Cart subtotal: $0
Create An Account Sign In

Work Breakdown Structure PowerPoint Template Diagrams

Work Breakdown Structure PowerPoint Template Diagrams

Work Breakdown Structure PowerPoint Template Diagrams Designs For Presentations

Best collection of The Work Breakdown Structure PowerPoint Templates, diagrams, and slides to visualize your deliverables,  the tasks, and subtasks needed to complete a project. The WPS chart helps the project managers, project team, and system engineers create the right formula to determine tasks, subtasks, and estimate the effort needed for a project based on the outcome, and eliminates unnecessary work to get the intended result.

What is the Work Breakdown Structure (WBS)?

According to the Project Management Body of Knowledge (PMBOK 5), a work breakdown structure template is “a hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables.

This collection of ready-to-use colorful PPT graphics presentations of  WBS Templates and Charts For PowerPoint contains 22 Creative and fully editable slides with many variations options. they are visually appealing, you can easily modify color schemes, add your texts, resize and move the shapes and icons of each slide as per your requirement.

This template is available as Google Slides Template:
Download Work Breakdown Structure Google Slides Template Here>

Key Features:

  • 22 Unique & Creative PowerPoint slides
  • 2 Aspect Ratio (4:3 & 16:9)
  • Fully and Easily editable content
  • 125+ Stunning Premade Theme colors. (What this means?)
  • 5500+ Vector Icons! easily change size & color
  • Unlimited Themes Color
  • One-click to change all colors to fully fit your brand’s color. (What this means?)
  • 100% Vector Objects & Icons
  • Free Fonts and Icons

Fonts:

  • Roboto

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Clear
Product License details

22

Unique Slides

  • 100% Fully Editable PowerPoint Slides
  • 2 Aspect Ratio (4:3 & 16:9)
  • Easy to edit and customize
  • Unlimited Themes Color
  • 125+ Premade Themes Color
  • 5500+ Vector Icons
  • 100% Vector Objects & Icons

Product Rating:

Share This Product